SprintCapacityPRO
🛡️ 100% Client-Side Privacy • Zero Backend Logs • YC & Scrum Alliance Aligned

Agile Sprint Capacity & Velocity Planner

Stop overcommitting in sprint planning. Model exact developer working days, individual PTO, public holidays, focus factors, and historical velocity to establish rock-solid sprint targets.

⚡ Quick Presets:

📅 1. Sprint Configuration

Baseline Cadence
days

Default 10 days = 2 weeks

hrs

Contractual work hours

days

Deducted from all members

Recommended (65-75%)
40% (Heavy overhead) 65% (Pragmatic default) 75% (Lean team) 90% (Zero meetings)

👥 2. Team Members & Individual Availability

Specify individual PTO and role-based allocations

Role / Name Days Off (PTO) Dedication Net Focus Hrs Action

📈 3. Historical Velocity & Calibration

Points Calibration
Historical Average: 44.0 pts Historical Standard Deviation: ±2.0 pts Hours per Story Point: ~6.8 hrs/pt
Sprint Capacity Verdict Optimal Load
Recommended Commitment
42 pts

Equates to ~298.5 focused engineering hours

🛡️ Conservative (90%)
38 pts
High confidence
🎯 Target (80%)
42 pts
Committed goal
🚀 Stretch (50%)
47 pts
If smooth sailing
Total Gross Capacity (100%): 440.0 hrs
Holidays & PTO Lost: -42.0 hrs
Net Working Capacity: 398.0 hrs
Focus Factor (Scrum Ceremonies Drag): 75% (-99.5 hrs)
Total Available Focus Hours: 298.5 hrs
⚖️ Backlog matches 104% of recommended capacity. Healthy stretch.

Mastering Agile Sprint Capacity & Velocity Planning

1. Why Focus Factor Matters

No developer codes for 8 hours a day. Between standups, backlog refinement, architecture syncs, code reviews, and Slack interruptions, productive coding time is typically 65% to 75%. Assuming 100% capacity guarantees sprint spillover and burnout.

2. Deducting PTO Correctly

Always deduct personal leaves and public holidays *before* calculating focus hours. When team members take staggered leaves, capacity drops non-linearly due to dependency handoffs and reduced review throughput.

3. Velocity vs. Capacity

Velocity tells you what the team accomplished in the past under previous conditions. Capacity tells you how much bandwidth the team actually has in the upcoming sprint. Always scale historical velocity proportionally to capacity changes.

Advertisement

Frequently Asked Questions

Is Agile Sprint Capacity & Velocity Planner free to use?

Yes, Agile Sprint Capacity & Velocity Planner is completely free with no signup or registration required. All processing happens directly in your browser.

Is my data safe?

Absolutely. Your data never leaves your device. Everything runs locally in your browser — no uploads, no servers, no tracking.

Do I need to install anything?

No installation needed. Agile Sprint Capacity & Velocity Planner works entirely in your web browser on both desktop and mobile devices.

How do I use

Simply enter or paste your input in the tool above, and the result will be generated instantly. No configuration required.

Verified Client-Side